A project to add Hythe Pier to the list of architectural and historically important buildings in England.
In conjunction with Hampshire & Isle of Wight Wildlife Trust (HIWWT), HPHA have organised for a large sea life mural to be created on and displayed at the end of the pier.
A structural survey and follow up report was commissioned. The purpose of the survey was to determine the Pier’s general condition and to make recommendations for the remediation of, and designate repair timeframes for, various structural defects.
Inspection of the condition of the buildings at the pier head (seaward side), the ticket office, and workshop buildings (landward side), as part of a Feasibility Assessment.
A survey to examine the existing services to the Hythe Pier and to conduct a feasibility study into the renovation of the pier buildings, land and shore side.
An inspection of the pier to determine its structural arrangement and general condition. This was a high-level inspection, providing general observations and preliminary recommendations. This assessment was performed to help HPHA plan the next steps in the preservation of the pier.
Following our project to protect the south side building from further deterioration, we have made temporary repairs to the roof and floor of the north side building. This building houses the waiting room.
Enhance the entrance to the pier and to make it more welcoming by painting, repairing, installing new roof edging and planting lots of flowers.
Protection of the pier-head south side building installing a new roof and repairing the walls and floor.
